TABLE OF CONTENTS
PAGES
Title Pages
Certification
Approval Page
Dedication
Acknowledgements
Table of Contents
Description of Works
CHAPTER ONE
- Order of Taking off
- Abstracting sheet
- Scheduled of Basic rate
CHAPTER TWO
Estimating
- Earthwork support
- Mass Concrete
- Reinforcement (Y12,Y10, B.R.C Mesh)
- Roof covering
CHAPTER THREE
- Bill number one: Preliminaries
3.2 Bill number two: Bill of Quantities
Summary
Appendix 1: Architectural Design
Appendix 2: Taking-off sheet
DESCRIPTION OF WORKS
This project research work is the proposed crech. It is a concrete frame / wall structure comprising of reinforced concrete, column base and strip foundation. The walls are hollow sandcrete block work.
The floors are screeded floors of cement and sand mortar mix (1:3). The roots covering sheet are alluminium corrugated long span fixed with single lap covering 150mm end laps to sawn treated hardwood purlins and suitable nails and washer. The windows fittings are preglazed aluminuim, shading windows also with 25mm x 25mm squared mild steel block frame pipe burglary proof in block work. The walls are painted using one prime coat and the finishing coat of emulsion paint on generally surfaces on rendered walls, externally, internally and on ceiling soffits. Three million naira only is allowed for electrical fittings, wiring, earthing and conduit and also, and addition of 5% for profit and 2.5% for attendance. The sum of Two million only is allowed for mechanical and plumbing installation and including excavation the doors are 44mm polished finished hardwood and doors with 50mm x 75mm wrought hardwood door frames to suit openings, complete with iron mongery to doors with 300mm high block fence with 450 x 450mm concrete piers at 3.00m centre complete. The quantities estimated for are earth work support, mass concrete, reinforcement (Y12, Y10), B.RC wire mesh, are reflected in the bill of quantities.